INSTALLATION OF NEW WATER NETWORK CHINGOLA RIVERSIDE EXTENSION
Client: Mulonga Water & Sewerage Company Ltd
Duration:7 Months
Year: 2013
The project was undertaken from March, 2013 to November, 2013.
The scope of the project was Excavation of Trenches, Installation of Pipes, Valves, Fire Hydrants, Water Meters and associated fittings. The total distance covered during this project was 12Kilometers covering 800 housing units. The project was executed and commissioned successfully.
Main stream trench Size: 1.2m x 0.6m
Household trench size: 0.6m x 0.5
PVC Pipe Size: 1’’, 2’’, 3’’, 4’’, 6’’ and 8’’
REHABILITATION, ASSEMBLY, INSTALLATION & COMMISSIONING OF BALL MILL
Client: Chambishi Metals Plc
Duration: 3 Months
Year: 2017
The Ball Mill was installed for grinding of Lime.
REHABILITATION, INSTALLATION & COMMISSIONING OF CONVEYOR
Client: Chambishi Metals Plc
Duration: 2 Months
Year: 2015
Designed and fabricated to collect materials from the Belt Filter at Cobalt Plant.
REHABILITATION OF GATE VALVES, DIAPHRAGMS VALVES, PLUG VALVES, KNIFE GATE & BUTTERFLY VALVES
Client: : Chibuluma Mines, Chambishi Metals & Ndola Lime
RECLAIM, DISMANTLING, REHABILITATION AND INSTALLATION OF EVAPCO COOLING TOWERS
Client: Chambishi Metals Plc
Duration: 6 Months
Year: 2014
After the successful completion of this project at Acid plant, the refurbished cooling Towers are now able to lower the temperatures from as high as 100 degrees Celsius to as low as 17 degrees Celsius for desired processes.